PAROWAN

Substation

Utah · PACIFICORP

Max voltage
230
kV

PAROWAN is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage138 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates37.8833, -112.9096

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70888230 kVPACIFICORP94.3 mi
#72525230 kVPACIFICORP25.7 mi
#72526138 kVPACIFICORP17.0 mi
#72527138 kVPACIFICORP34.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PAROWAN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PAROWAN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WEST CEDARSubstation-AdjacentUTIron County230 kV300 MW1.7 yrs66.5
THREE PEAKSSubstation-AdjacentUTIron County345 kV600 MW1.7 yrs66.4
TAP206480Substation-AdjacentUTBeaver County230 kV300 MW1.7 yrs66.4
UNKNOWN202807Substation-AdjacentUTIron County230 kV300 MW1.7 yrs66.1
Greenfield (THREE PEAKS - RED BUTTE)GreenfieldUTIron County345 kV600 MW1.7 yrs64.2
COLEMANSubstation-AdjacentUTIron County138 kV100 MW1.7 yrs64.0
Greenfield (SIGURD - THREE PEAKS)GreenfieldUTIron County345 kV600 MW1.7 yrs63.7
PAROWANSubstation-AdjacentUTIron County230 kV300 MW1.7 yrs63.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.