MONUMENT

Substation

Utah · PACIFICORP

Max voltage
230
kV

MONUMENT is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates41.6946, -110.0330

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68616230 kVPACIFICORP19.5 mi
#68618230 kVPACIFICORP12.8 mi
#68619230 kVPACIFICORP30.1 mi
#68620230 kVPACIFICORP6.7 mi
#68625230 kVPACIFICORP18.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MONUMENT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MONUMENT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN202402Substation-AdjacentWYLincoln County230 kV300 MW1.7 yrs71.6
UNKNOWN202400Substation-AdjacentWYLincoln County230 kV300 MW1.7 yrs70.6
CRAVEN CREEKSubstation-AdjacentWYLincoln County230 kV300 MW1.7 yrs70.1
UNKNOWN201480Substation-AdjacentWYLincoln County230 kV300 MW1.7 yrs68.8
UNKNOWN202399Substation-AdjacentWYUinta County230 kV300 MW1.7 yrs67.2
UNKNOWN202531Substation-AdjacentWYLincoln County230 kV300 MW1.7 yrs67.1
SOUTH TRONASubstation-AdjacentWYUinta County230 kV300 MW1.7 yrs66.0
UNKNOWN202401Substation-AdjacentWYSweetwater County230 kV300 MW1.7 yrs65.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MONUMENT substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.