JIM BRIDGER

Substation

Utah · IDAHO POWER CO

Max voltage
345
kV

JIM BRIDGER is an electric transmission substation in Utah, operated by IDAHO POWER CO. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage230 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorIDAHO POWER CO
Co-ownerPACIFICORP
StateUtah
Coordinates41.7349, -108.7903

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67262345 kVIDAHO POWER CO174.2 mi
#67263345 kVPACIFICORP192.9 mi
#67264345 kVPACIFICORP192.9 mi
#68629230 kVPACIFICORP33.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JIM BRIDGER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JIM BRIDGER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JIM BRIDGERSubstation-AdjacentWYSweetwater County345 kV600 MW1.7 yrs69.3
POINT OF ROCKSSubstation-AdjacentWYSweetwater County230 kV300 MW1.7 yrs67.1
BITTER CREEKSubstation-AdjacentWYSweetwater County230 kV300 MW1.7 yrs66.3
UNKNOWN202468Substation-AdjacentWYSweetwater County230 kV300 MW1.7 yrs66.1
Greenfield (POPULUS - JIM BRIDGER)GreenfieldWYSweetwater County345 kV600 MW1.7 yrs62.3
UNKNOWN209494Substation-AdjacentWYSweetwater County115 kV100 MW1.7 yrs61.9
Greenfield (POPULUS - JIM BRIDGER)GreenfieldWYSweetwater County345 kV600 MW1.7 yrs60.7
Greenfield (POPULUS - JIM BRIDGER)GreenfieldWYSweetwater County345 kV600 MW1.7 yrs60.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JIM BRIDGER substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.