HATCH

Substation

Utah · EMPIRE ELECTRIC ASSN, INC

Max voltage
138
kV

HATCH is an electric transmission substation in Utah, operated by EMPIRE ELECTRIC ASSN, INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorEMPIRE ELECTRIC ASSN, INC
Co-ownerPACIFICORP
StateUtah
Coordinates38.1601, -109.3080

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70804138 kVEMPIRE ELECTRIC ASSN, INC10.4 mi
#71424138 kVPACIFICORP37.0 mi
#79159138 kVPACIFICORP21.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HATCH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HATCH substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (HUNTINGTON - PINTO)GreenfieldUTGrand County345 kV600 MW1.7 yrs63.0
Greenfield (HUNTINGTON - PINTO)GreenfieldUTGrand County345 kV600 MW1.7 yrs62.8
Greenfield (HUNTINGTON - PINTO)GreenfieldUTGrand County345 kV600 MW1.7 yrs62.1
HATCHSubstation-AdjacentUTSan Juan County138 kV100 MW1.7 yrs61.6
Greenfield (HUNTINGTON - PINTO)GreenfieldUTSan Juan County345 kV600 MW1.7 yrs61.3
PINTOSubstation-AdjacentUTSan Juan County345 kV600 MW3.5 yrs59.2
UNKNOWN205449Substation-AdjacentCOSan Miguel County138 kV100 MW1.7 yrs58.9
Greenfield (HUNTINGTON - PINTO)GreenfieldUTSan Juan County345 kV600 MW1.7 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.