FIREHOLE

Substation

Utah · PACIFICORP

Max voltage
230
kV

FIREHOLE is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates41.5368, -109.2728

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68611230 kVPACIFICORP6.8 mi
#68612230 kVPACIFICORP34.6 mi
#68614230 kVPACIFICORP12.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FIREHOLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FIREHOLE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN202321Substation-AdjacentWYSweetwater County230 kV300 MW1.7 yrs66.6
ROCK SPRINGSSubstation-AdjacentWYSweetwater County230 kV300 MW1.7 yrs65.5
UNKNOWN202367Substation-AdjacentWYSweetwater County230 kV300 MW1.7 yrs64.3
UNKNOWN202334Substation-AdjacentWYSweetwater County230 kV300 MW1.7 yrs64.1
Greenfield (POPULUS - JIM BRIDGER)GreenfieldWYSweetwater County345 kV600 MW1.7 yrs62.6
Greenfield (POPULUS - JIM BRIDGER)GreenfieldWYSweetwater County345 kV600 MW1.7 yrs62.3
Greenfield (POPULUS - JIM BRIDGER)GreenfieldWYSweetwater County345 kV600 MW1.7 yrs60.7
UNKNOWN202170Substation-AdjacentWYSweetwater County115 kV100 MW1.7 yrs60.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen