EMERY

Substation

Utah · PACIFICORP

Max voltage
345
kV

EMERY is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as high-voltage (345 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines8

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates39.1773, -111.0286

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67300345 kVPACIFICORP85.7 mi
#67301345 kVPACIFICORP19.7 mi
#67302345 kVPACIFICORP74.8 mi
#67303345 kVPACIFICORP74.7 mi
#73153345 kVPACIFICORP0.3 mi
#73154345 kVPACIFICORP0.3 mi
#73155345 kVPACIFICORP0.3 mi
#73156345 kVPACIFICORP0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EMERY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EMERY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HUNTERSubstation-AdjacentUTEmery County345 kV600 MW1.7 yrs69.8
HUNTINGTONSubstation-AdjacentUTSanpete County345 kV600 MW1.7 yrs68.3
Greenfield (HUNTINGTON - SPANISH FORK)GreenfieldUTCarbon County345 kV600 MW1.7 yrs64.8
Greenfield (HUNTINGTON - MONA)GreenfieldUTSanpete County345 kV600 MW1.7 yrs63.2
MCFADDENSubstation-AdjacentUTEmery County138 kV100 MW1.7 yrs63.1
Greenfield (EMERY - HUNTINGTON)GreenfieldUTEmery County345 kV600 MW1.7 yrs63.1
UNKNOWN206756Substation-AdjacentUTCarbon County138 kV100 MW1.7 yrs63.1
Greenfield (EMERY - SIGURD)GreenfieldUTEmery County345 kV600 MW1.7 yrs62.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EMERY substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.