CLOVER

Substation

Utah · PACIFICORP

Max voltage
345
kV

CLOVER is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as high-voltage (345 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines8

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates39.9299, -111.9903

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67288345 kVPACIFICORP3.3 mi
#67289345 kVPACIFICORP3.2 mi
#67290345 kVPACIFICORP67.3 mi
#67291345 kVPACIFICORP67.5 mi
#72395138 kVPACIFICORP26.3 mi
#74013138 kVPACIFICORP99.5 mi
#74014138 kVPACIFICORP78.3 mi
#76248138 kVPACIFICORP7.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CLOVER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CLOVER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLOVERSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs69.3
UNKNOWN201631Substation-AdjacentUTUtah County115 kV100 MW1.7 yrs68.9
TAP205470Substation-AdjacentUTUtah County115 kV100 MW1.7 yrs68.8
UNKNOWN201916Substation-AdjacentUTUtah County115 kV100 MW1.7 yrs68.7
UNKNOWN205469Substation-AdjacentUTUtah County115 kV100 MW1.7 yrs68.5
UNKNOWN201633Substation-AdjacentUTUtah County115 kV100 MW1.7 yrs68.4
TAP205471Substation-AdjacentUTUtah County115 kV100 MW1.7 yrs68.3
UNKNOWN201436Substation-AdjacentUTUtah County115 kV100 MW1.7 yrs68.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CLOVER substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.