BIRCH CREEK

Substation

Utah · PACIFICORP

Max voltage
230
kV

BIRCH CREEK is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage138 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates41.5352, -111.1095

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68573230 kVPACIFICORP55.1 mi
#68626230 kVPACIFICORP32.9 mi
#69791138 kVPACIFICORP19.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BIRCH CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BIRCH CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIRCH CREEKSubstation-AdjacentUTRich County230 kV300 MW1.7 yrs64.1
UNKNOWN204371Substation-AdjacentWYUinta County115 kV100 MW1.7 yrs62.4
TAP204372Substation-AdjacentWYUinta County138 kV100 MW1.7 yrs62.1
UNKNOWN205659Substation-AdjacentWYUinta County115 kV100 MW1.7 yrs61.5
UNKNOWN204365Substation-AdjacentWYUinta County115 kV100 MW1.7 yrs61.3
RAILROADSubstation-AdjacentWYUinta County138 kV100 MW1.7 yrs60.4
UNKNOWN204369Substation-AdjacentWYUinta County115 kV100 MW1.7 yrs60.1
UNKNOWN202152Substation-AdjacentWYUinta County115 kV100 MW1.7 yrs60.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen