ABAJO

Substation

Utah · NORTHERN WASCO COUNTY PUD

Max voltage
138
kV

ABAJO is an electric transmission substation in Utah, operated by NORTHERN WASCO COUNTY PUD. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
Co-ownerPACIFICORP
StateUtah
Coordinates37.3042, -109.5484

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#78372138 kVNORTHERN WASCO COUNTY PUD0.1 mi
#78482138 kVPACIFICORPIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ABAJO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ABAJO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (PINTO - FOUR CORNERS)GreenfieldUTSan Juan County345 kV600 MW3.5 yrs61.5
Greenfield (PINTO - FOUR CORNERS)GreenfieldUTSan Juan County345 kV600 MW3.5 yrs60.8
Greenfield (SHIPROCK - KAYENTA)GreenfieldUTSan Juan County230 kV300 MW3.5 yrs60.7
Greenfield (SHIPROCK - KAYENTA)GreenfieldUTSan Juan County230 kV300 MW3.5 yrs60.0
Greenfield (PINTO - FOUR CORNERS)GreenfieldUTSan Juan County345 kV600 MW3.5 yrs59.5
Greenfield (PINTO - FOUR CORNERS)GreenfieldCOMontezuma County345 kV600 MW3.5 yrs59.2
Greenfield (SHIPROCK - KAYENTA)GreenfieldUTSan Juan County230 kV300 MW3.5 yrs58.6
Greenfield (SHIPROCK - KAYENTA)GreenfieldUTSan Juan County230 kV300 MW3.5 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ABAJO substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.