WISE COUNTY POWER LLC

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
138
kV

WISE COUNTY POWER LLC is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates33.0603, -97.9097

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84212138 kVONCOR ELECTRIC DELIVERY CO.0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WISE COUNTY POWER LLC, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WISE COUNTY POWER LLC substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN306159Substation-AdjacentTXParker County345 kV600 MW3.4 yrs71.2
UNKNOWN308515Substation-AdjacentTXParker County345 kV600 MW3.4 yrs71.2
UNKNOWN300877Substation-AdjacentTXWise County345 kV600 MW3.4 yrs69.2
JACK COUNTYSubstation-AdjacentTXJack County345 kV600 MW3.4 yrs68.5
UNKNOWN309499Substation-AdjacentTXParker County345 kV600 MW3.4 yrs67.6
UNKNOWN303013Substation-AdjacentTXTarrant County138 kV100 MW3.4 yrs67.1
JACKSBOROSubstation-AdjacentTXJack County345 kV600 MW3.4 yrs66.0
BRIARSubstation-AdjacentTXWise County138 kV100 MW3.4 yrs65.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WISE COUNTY POWER LLC substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.