WHEELER
SubstationTexas · GREENBELT ELECTRIC COOP, INC
WHEELER is an electric transmission substation in Texas, operated by GREENBELT ELECTRIC COOP, INC. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #10196 | 230 kV | PUBLIC SERVICE CO OF OKLAHOMA | IN SERVICE | 18.9 mi |
| #83486 | 230 kV | GREENBELT ELECTRIC COOP, INC | IN SERVICE | 36.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of WHEELER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BORDER | Substation-Adjacent | OK | Beckham County | 345 kV | 600 MW | 3.4 yrs | 71.6 |
| UNKNOWN168526 | Substation-Adjacent | OK | Beckham County | 230 kV | 300 MW | 3.4 yrs | 68.7 |
| UNKNOWN118502 | Substation-Adjacent | OK | Beckham County | 230 kV | 300 MW | 3.4 yrs | 67.4 |
| ELK CITY LLC | Substation-Adjacent | OK | Roger Mills County | 230 kV | 300 MW | 3.4 yrs | 65.3 |
| Greenfield (WOODWARD - BORDER) | Greenfield | OK | Beckham County | 345 kV | 600 MW | 3.4 yrs | 63.5 |
| Greenfield (UNKNOWN118502 - UNKNOWN168527) | Greenfield | OK | Beckham County | 230 kV | 300 MW | 3.4 yrs | 61.9 |
| Greenfield (MIAMI WIND - GRAY) | Greenfield | TX | Gray County | 345 kV | 600 MW | 3.4 yrs | 61.8 |
| MIAMI WIND | Substation-Adjacent | TX | Hemphill County | 345 kV | 600 MW | 3.4 yrs | 61.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for WHEELER substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.