WALDEN

Substation

Texas · CENTERPOINT ENERGY

Max voltage
138
kV

WALDEN is an electric transmission substation in Texas, operated by CENTERPOINT ENERGY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorCENTERPOINT ENERGY
Co-ownerENTERGY TEXAS, INC.
StateTexas
Coordinates30.3956, -95.6205

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87101138 kVENTERGY TEXAS, INC.IN SERVICE4.0 mi
#91981138 kVCENTERPOINT ENERGYIN SERVICE2.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WALDEN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WALDEN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROTHWOODSubstation-AdjacentTXMontgomery County345 kV600 MW3.4 yrs75.8
TOMBALLSubstation-AdjacentTXMontgomery County345 kV600 MW3.4 yrs73.8
SINGLETONSubstation-AdjacentTXGrimes County345 kV600 MW3.4 yrs71.9
UNKNOWN302822Substation-AdjacentTXMontgomery County230 kV300 MW3.4 yrs71.8
KUYKENDAHLSubstation-AdjacentTXMontgomery County345 kV600 MW3.4 yrs71.2
METROSubstation-AdjacentTXMontgomery County138 kV100 MW3.4 yrs69.0
OAK RIDGESubstation-AdjacentTXMontgomery County138 kV100 MW3.4 yrs68.9
KLEINSubstation-AdjacentTXHarris County138 kV100 MW3.4 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.