VALLIANT

Substation

Texas · PUBLIC SERVICE CO OF OKLAHOMA

Max voltage
345
kV

VALLIANT is an electric transmission substation in Texas, operated by PUBLIC SERVICE CO OF OKLAHOMA. It is classified as high-voltage (345 kv) and connects 10 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines10

Ownership & operation

OperatorPUBLIC SERVICE CO OF OKLAHOMA
StateTexas
Coordinates33.9357, -95.0913

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#51510345 kVPUBLIC SERVICE CO OF OKLAHOMA78.7 mi
#8008345 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE43.4 mi
#14249345 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE17.9 mi
#3119345 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE70.1 mi
#14227138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE18.0 mi
#48759138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE4.0 mi
#14297138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE18.3 mi
#33727138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE28.9 mi
#11045138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE24.2 mi
#11046138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE11.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of VALLIANT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near VALLIANT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HUGO (345 KV)Substation-AdjacentOKChoctaw County345 kV600 MW3.4 yrs69.6
UNKNOWN118754Substation-AdjacentOKMcCurtain County138 kV100 MW3.4 yrs66.4
Greenfield (HUGO (345 KV) - VALLIANT)GreenfieldOKMcCurtain County345 kV600 MW3.4 yrs65.8
TAP142404Substation-AdjacentOKMcCurtain County138 kV100 MW3.4 yrs65.7
UNKNOWN118751Substation-AdjacentOKMcCurtain County138 kV100 MW3.4 yrs65.4
UNKNOWN118753Substation-AdjacentOKMcCurtain County138 kV100 MW3.4 yrs65.3
VALLIANTSubstation-AdjacentTXRed River County345 kV600 MW3.4 yrs65.2
Greenfield (HUGO (345 KV) - SUNNYSIDE)GreenfieldOKChoctaw County345 kV600 MW3.4 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for VALLIANT substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.