TOMBSTONE

Substation

Texas · AEP TEXAS NORTH CO.

Max voltage
138
kV

TOMBSTONE is an electric transmission substation in Texas, operated by AEP TEXAS NORTH CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorAEP TEXAS NORTH CO.
Co-ownerRIO GRANDE ELECTRIC COOP, INC
StateTexas
Coordinates31.0025, -102.6790

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81450138 kVIN SERVICE29.5 mi
#82362138 kVRIO GRANDE ELECTRIC COOP, INCIN SERVICE17.2 mi
#83388138 kVAEP TEXAS NORTH CO.IN SERVICE17.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TOMBSTONE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TOMBSTONE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BAKERSFIELDSubstation-AdjacentTXPecos County345 kV600 MW3.4 yrs67.0
WAYMARKSubstation-AdjacentTXUpton County345 kV600 MW3.4 yrs64.3
UNKNOWN308319Substation-AdjacentTXPecos County138 kV100 MW3.4 yrs61.9
UNKNOWN309438Substation-AdjacentTXUpton County138 kV100 MW3.4 yrs60.6
RIO PECOSSubstation-AdjacentTXCrane County138 kV100 MW3.4 yrs59.9
WHITE BAKERSubstation-AdjacentTXPecos County138 kV100 MW3.4 yrs59.4
WOODWARD-TAP2ASubstation-AdjacentTXPecos County138 kV100 MW3.4 yrs58.7
UNKNOWN304745Substation-AdjacentTXPecos County138 kV100 MW3.4 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen