TOLEDO BEND

Substation

Texas

Max voltage
138
kV

TOLEDO BEND is an electric transmission substation in Texas. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

StateTexas
Coordinates31.2542, -93.3445

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8011138 kVIN SERVICE22.6 mi
#14323138 kVIN SERVICE21.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TOLEDO BEND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TOLEDO BEND substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LEACHSubstation-AdjacentTXSabine County500 kV1,000 MW3.4 yrs67.8
Greenfield (UNKNOWN157576 - HARTBURG)GreenfieldLASabine Parish500 kV1,000 MW3.4 yrs64.8
EAST LEESVILLESubstation-AdjacentLAVernon Parish230 kV300 MW1.4 yrs64.4
UNKNOWN112573Substation-AdjacentLASabine Parish230 kV300 MW1.4 yrs64.0
LEESVILLESubstation-AdjacentLAVernon Parish230 kV300 MW1.4 yrs64.0
UNKNOWN115956Substation-AdjacentLASabine Parish138 kV100 MW1.4 yrs62.5
Greenfield (UNKNOWN157576 - HARTBURG)GreenfieldLASabine Parish500 kV1,000 MW3.4 yrs62.4
Greenfield (HARTBURG - LEACH)GreenfieldTXNewton County500 kV1,000 MW3.4 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TOLEDO BEND substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.