TERRY CO

Substation

Texas · LYNTEGAR ELECTRIC COOP, INC

Max voltage
115
kV

TERRY CO is an electric transmission substation in Texas, operated by LYNTEGAR ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorLYNTEGAR ELECTRIC COOP, INC
StateTexas
Coordinates33.3046, -102.3275

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81160115 kVLYNTEGAR ELECTRIC COOP, INCIN SERVICE20.6 mi
#91755115 kVLYNTEGAR ELECTRIC COOP, INC37.7 mi
#92141115 kVLYNTEGAR ELECTRIC COOP, INCIN SERVICE14.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TERRY CO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TERRY CO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN300063Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs69.0
UNKNOWN304924Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs68.8
UNKNOWN306021Substation-AdjacentTXHockley County230 kV300 MW3.4 yrs68.4
UNKNOWN305684Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs68.0
UNKNOWN307246Substation-AdjacentTXHockley County230 kV300 MW3.4 yrs66.7
UNKNOWN303374Substation-AdjacentTXLubbock County115 kV100 MW3.4 yrs64.9
UNKNOWN308259Substation-AdjacentTXLubbock County115 kV100 MW3.4 yrs64.8
UNKNOWN308963Substation-AdjacentTXLubbock County115 kV100 MW3.4 yrs64.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.