TAP318022

Substation

Texas · CENTRAL VALLEY ELECTRIC COOPERATIVE

Max voltage
115
kV

TAP318022 is an electric transmission substation in Texas, operated by CENTRAL VALLEY ELECTRIC COOPERATIVE. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorCENTRAL VALLEY ELECTRIC COOPERATIVE
StateTexas
Coordinates33.4524, -104.4839

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79474115 kVCENTRAL VALLEY ELECTRIC COOPERATIVEIN SERVICE4.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP318022, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP318022 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN301362Substation-AdjacentNMChaves County115 kV100 MW3.4 yrs63.1
CHAVESSubstation-AdjacentNMChaves County230 kV300 MW3.4 yrs62.4
UNKNOWN306713Substation-AdjacentNMChaves County115 kV100 MW3.4 yrs62.3
UNKNOWN301462Substation-AdjacentNMChaves County115 kV100 MW3.4 yrs62.2
TAP307882Substation-AdjacentNMChaves County115 kV100 MW3.4 yrs61.4
TAP318022Substation-AdjacentNMChaves County115 kV100 MW3.4 yrs60.8
Greenfield (UNKNOWN304668 - CHAVES)GreenfieldNMChaves County230 kV300 MW3.4 yrs60.7
Greenfield (UNKNOWN304668 - CHAVES)GreenfieldNMChaves County230 kV300 MW3.4 yrs60.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP318022 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.