TAP312625
SubstationTexas · ONCOR ELECTRIC DELIVERY CO.
TAP312625 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #80375 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | — | 2.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP312625, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN300985 | Substation-Adjacent | TX | McLennan County | 345 kV | 600 MW | 3.4 yrs | 74.9 |
| Lake Creek | Brownfield | TX | McLennan | — | 1,357 MW | — | 73.1 |
| LAKE CREEK | Substation-Adjacent | TX | McLennan County | 345 kV | 600 MW | 3.4 yrs | 72.8 |
| ELM MOTT 345 | Substation-Adjacent | TX | McLennan County | 345 kV | 600 MW | 3.4 yrs | 72.4 |
| UNKNOWN306704 | Substation-Adjacent | TX | McLennan County | 345 kV | 600 MW | 3.4 yrs | 70.7 |
| TEMPLE PECAN CREEK | Substation-Adjacent | TX | Bell County | 345 kV | 600 MW | 3.4 yrs | 70.2 |
| UNKNOWN301218 | Substation-Adjacent | TX | McLennan County | 161 kV | 100 MW | 3.4 yrs | 68.6 |
| UNKNOWN309681 | Substation-Adjacent | TX | McLennan County | 138 kV | 100 MW | 3.4 yrs | 68.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP312625 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.