TAP310943
SubstationTexas · CITY OF LUBBOCK - (TX)
TAP310943 is an electric transmission substation in Texas, operated by CITY OF LUBBOCK - (TX). It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #80239 | 115 kV | CITY OF LUBBOCK - (TX) | IN SERVICE | 0.8 mi |
| #80240 | 115 kV | CITY OF LUBBOCK - (TX) | IN SERVICE | 1.3 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP310943, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN303155 | Substation-Adjacent | TX | Lubbock County | 230 kV | 300 MW | 3.4 yrs | 71.7 |
| TY COOKE | Substation-Adjacent | TX | Lubbock County | 230 kV | 300 MW | 3.4 yrs | 71.1 |
| UNKNOWN303927 | Substation-Adjacent | TX | Hale County | 230 kV | 300 MW | 3.4 yrs | 70.2 |
| UNKNOWN300063 | Substation-Adjacent | TX | Lubbock County | 230 kV | 300 MW | 3.4 yrs | 69.0 |
| UNKNOWN304924 | Substation-Adjacent | TX | Lubbock County | 230 kV | 300 MW | 3.4 yrs | 68.8 |
| UNKNOWN305684 | Substation-Adjacent | TX | Lubbock County | 230 kV | 300 MW | 3.4 yrs | 68.0 |
| TUCO | Substation-Adjacent | TX | Hale County | 345 kV | 600 MW | 3.4 yrs | 67.7 |
| GRASSLAND | Substation-Adjacent | TX | Lynn County | 230 kV | 300 MW | 3.4 yrs | 66.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP310943 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.