TAP310925

Substation

Texas · ONCOR ELECTRIC DELIVERY COMPANY LLC

Max voltage
138
kV

TAP310925 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY COMPANY LLC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY COMPANY LLC
StateTexas
Coordinates30.8961, -96.6521

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79820138 kVONCOR ELECTRIC DELIVERY COMPANY LLCIN SERVICE3.4 mi
#86186138 kVONCOR ELECTRIC DELIVERY COMPANY LLCIN SERVICE2.4 mi
#91671138 kV6.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310925, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310925 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JACK CREEKSubstation-AdjacentTXBrazos County345 kV600 MW3.4 yrs72.6
FAYETTEVILLESubstation-AdjacentTXBrazos County345 kV600 MW3.4 yrs71.8
TWIN OAKSubstation-AdjacentTXRobertson County345 kV600 MW3.4 yrs70.7
UNKNOWN312648Substation-AdjacentTXBrazos County138 kV100 MW3.4 yrs69.2
TAP312651Substation-AdjacentTXBrazos County138 kV100 MW3.4 yrs69.1
Major Oak PowerBrownfieldTXRobertson600 MW68.5
Bryan (TX)BrownfieldTXBrazos116 MW68.5
TAP312647Substation-AdjacentTXBrazos County138 kV100 MW3.4 yrs68.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP310925 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.