TAP310808

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
138
kV

TAP310808 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates31.9946, -101.4821

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81245138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE13.4 mi
#82660138 kVONCOR ELECTRIC DELIVERY CO.15.1 mi
#89533138 kVONCOR ELECTRIC DELIVERY CO.0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310808, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310808 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN310087Substation-AdjacentTXMartin County345 kV600 MW3.4 yrs69.6
UNKNOWN306995Substation-AdjacentTXHoward County345 kV600 MW3.4 yrs68.8
UNKNOWN308253Substation-AdjacentTXHoward County345 kV600 MW3.4 yrs68.6
UNKNOWN307631Substation-AdjacentTXHoward County345 kV600 MW3.4 yrs66.4
UNKNOWN304833Substation-AdjacentTXSterling County345 kV600 MW3.4 yrs64.6
UNKNOWN309579Substation-AdjacentTXMartin County138 kV100 MW3.4 yrs63.3
Greenfield (UNKNOWN301162 - UNKNOWN301484)GreenfieldTXMartin County345 kV600 MW3.4 yrs62.7
UNKNOWN301173Substation-AdjacentTXMartin County138 kV100 MW3.4 yrs62.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen