TAP310799

Substation

Texas · SOUTHWESTERN ELECTRIC POWER CO.

Max voltage
138
kV

TAP310799 is an electric transmission substation in Texas, operated by SOUTHWESTERN ELECTRIC POWER CO.. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorSOUTHWESTERN ELECTRIC POWER CO.
Co-ownerUPSHUR RURAL ELEC COOP CORP
StateTexas
Coordinates32.3519, -94.7319

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84214138 kVUPSHUR RURAL ELEC COOP CORPIN SERVICE4.5 mi
#92607138 kVSOUTHWESTERN ELECTRIC POWER CO.IN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310799, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310799 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MARTIN LAKESSubstation-AdjacentTXRusk County345 kV600 MW3.4 yrs72.8
DIANASubstation-AdjacentTXUpshur County345 kV600 MW3.4 yrs70.9
UNKNOWN308218Substation-AdjacentTXRusk County345 kV600 MW3.4 yrs70.2
UNKNOWN304391Substation-AdjacentTXRusk County345 kV600 MW3.4 yrs69.8
UNKNOWN302347Substation-AdjacentTXMarion County345 kV600 MW3.4 yrs69.6
UNKNOWN304659Substation-AdjacentTXGregg County345 kV600 MW3.4 yrs69.0
PirkeyBrownfieldTXHarrison721 MW68.4
UNKNOWN309941Substation-AdjacentTXHarrison County345 kV600 MW3.4 yrs67.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP310799 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.