TAP310778
SubstationTexas · AEP TEXAS NORTH CO.
TAP310778 is an electric transmission substation in Texas, operated by AEP TEXAS NORTH CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #87905 | 138 kV | SOUTH PLAINS ELECTRIC COOP INC | IN SERVICE | 14.5 mi |
| #87999 | 138 kV | AEP TEXAS NORTH CO. | IN SERVICE | 0.0 mi |
| #91210 | 138 kV | TRI-COUNTY ELECTRIC COOP, INC | IN SERVICE | 42.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP310778, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EDITH CLARK | Substation-Adjacent | TX | Foard County | 345 kV | 600 MW | 3.4 yrs | 66.5 |
| UNKNOWN306567 | Substation-Adjacent | TX | Wilbarger County | 138 kV | 100 MW | 3.4 yrs | 63.8 |
| UNKNOWN302012 | Substation-Adjacent | TX | Wilbarger County | 138 kV | 100 MW | 3.4 yrs | 63.6 |
| UNKNOWN309709 | Substation-Adjacent | OK | Jackson County | 138 kV | 100 MW | 3.4 yrs | 62.8 |
| UNKNOWN118741 | Substation-Adjacent | OK | Jackson County | 138 kV | 100 MW | 3.4 yrs | 61.9 |
| BLUE SUMMIT WIND LLC | Substation-Adjacent | TX | Wilbarger County | 138 kV | 100 MW | 3.4 yrs | 61.1 |
| Greenfield (EDITH CLARK - UNKNOWN300376) | Greenfield | TX | Wilbarger County | 345 kV | 600 MW | 3.4 yrs | 60.7 |
| UNKNOWN303443 | Substation-Adjacent | TX | Wilbarger County | 138 kV | 100 MW | 3.4 yrs | 60.7 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP310778 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.