TAP310732

Substation

Texas · BROWNSVILLE PUBLIC UTILITIES BOARD

Max voltage
138
kV

TAP310732 is an electric transmission substation in Texas, operated by BROWNSVILLE PUBLIC UTILITIES BOARD. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorBROWNSVILLE PUBLIC UTILITIES BOARD
StateTexas
Coordinates25.9412, -97.4698

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85444138 kVIN SERVICE0.8 mi
#88645138 kVBROWNSVILLE PUBLIC UTILITIES BOARDIN SERVICE6.6 mi
#92077138 kVBROWNSVILLE PUBLIC UTILITIES BOARDIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310732, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310732 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN305746Substation-AdjacentTXCameron County345 kV600 MW3.4 yrs74.5
UNKNOWN308524Substation-AdjacentTXCameron County138 kV100 MW3.4 yrs69.7
UNKNOWN306206Substation-AdjacentTXCameron County138 kV100 MW3.4 yrs69.6
UNKNOWN303488Substation-AdjacentTXCameron County138 kV100 MW3.4 yrs68.0
UNKNOWN303286Substation-AdjacentTXWillacy County138 kV100 MW3.4 yrs67.9
Aegle PowerBrownfieldTXCameron County138 kV1,282 MW3.4 yrs67.7
UNKNOWN310195Substation-AdjacentTXCameron County138 kV100 MW3.4 yrs67.0
UNKNOWN310396Substation-AdjacentTXCameron County138 kV100 MW3.4 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP310732 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.