TAP310674

Substation

Texas · SOUTHWESTERN ELECTRIC POWER CO

Max voltage
138
kV

TAP310674 is an electric transmission substation in Texas, operated by SOUTHWESTERN ELECTRIC POWER CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorSOUTHWESTERN ELECTRIC POWER CO
StateTexas
Coordinates32.8179, -94.5420

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84176138 kVSOUTHWESTERN ELECTRIC POWER CO11.0 mi
#91835138 kVSOUTHWESTERN ELECTRIC POWER CO2.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310674, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310674 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DIANASubstation-AdjacentTXUpshur County345 kV600 MW3.4 yrs70.9
UNKNOWN309146Substation-AdjacentTXMorris County345 kV600 MW3.4 yrs70.5
UNKNOWN301295Substation-AdjacentTXMarion County345 kV600 MW3.4 yrs70.1
UNKNOWN302347Substation-AdjacentTXMarion County345 kV600 MW3.4 yrs69.6
UNKNOWN305499Substation-AdjacentTXMarion County345 kV600 MW3.4 yrs69.6
UNKNOWN304659Substation-AdjacentTXGregg County345 kV600 MW3.4 yrs69.0
PirkeyBrownfieldTXHarrison721 MW68.4
UNKNOWN309941Substation-AdjacentTXHarrison County345 kV600 MW3.4 yrs67.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.