TAP310616
SubstationTexas · BAILEY COUNTY ELEC COOP ASSN
TAP310616 is an electric transmission substation in Texas, operated by BAILEY COUNTY ELEC COOP ASSN. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #89406 | 115 kV | BAILEY COUNTY ELEC COOP ASSN | IN SERVICE | 8.5 mi |
| #90135 | 115 kV | BAILEY COUNTY ELEC COOP ASSN | IN SERVICE | 9.9 mi |
| #90498 | 115 kV | — | — | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP310616, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WINDMILL | Substation-Adjacent | TX | Castro County | 345 kV | 600 MW | 3.4 yrs | 70.4 |
| UNKNOWN307714 | Substation-Adjacent | TX | Lamb County | 345 kV | 600 MW | 3.4 yrs | 69.7 |
| PLANT X | Substation-Adjacent | TX | Lamb County | 230 kV | 300 MW | 3.4 yrs | 69.1 |
| Plant X | Brownfield | TX | Lamb | — | 244 MW | — | 68.0 |
| UNKNOWN308766 | Substation-Adjacent | TX | Castro County | 138 kV | 100 MW | 3.4 yrs | 65.5 |
| DAWN | Substation-Adjacent | TX | Randall County | 115 kV | 100 MW | 3.4 yrs | 64.7 |
| UNKNOWN303131 | Substation-Adjacent | TX | Bailey County | 115 kV | 100 MW | 3.4 yrs | 64.6 |
| HEREFORD SOUTH | Substation-Adjacent | TX | Deaf Smith County | 138 kV | 100 MW | 3.4 yrs | 64.6 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP310616 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.