TAP310578

Substation

Texas · CITY OF LUBBOCK - (TX)

Max voltage
115
kV

TAP310578 is an electric transmission substation in Texas, operated by CITY OF LUBBOCK - (TX). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorCITY OF LUBBOCK - (TX)
StateTexas
Coordinates33.6141, -101.9562

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83622115 kVCITY OF LUBBOCK - (TX)IN SERVICE0.0 mi
#90427115 kVCITY OF LUBBOCK - (TX)IN SERVICE4.0 mi
#90821115 kVCITY OF LUBBOCK - (TX)2.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310578, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310578 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN303155Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs71.7
TY COOKESubstation-AdjacentTXLubbock County230 kV300 MW3.4 yrs71.1
UNKNOWN303927Substation-AdjacentTXHale County230 kV300 MW3.4 yrs70.2
UNKNOWN307292Substation-AdjacentTXLamb County230 kV300 MW3.4 yrs69.4
UNKNOWN300063Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs69.0
UNKNOWN304924Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs68.8
UNKNOWN305684Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs68.0
TUCOSubstation-AdjacentTXHale County345 kV600 MW3.4 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP310578 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.