TAP308176

Substation

Texas · SOUTHWESTERN PUBLIC SERVICE CO.

Max voltage
115
kV

TAP308176 is an electric transmission substation in Texas, operated by SOUTHWESTERN PUBLIC SERVICE CO.. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorSOUTHWESTERN PUBLIC SERVICE CO.
StateTexas
Coordinates34.1231, -101.8359

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#80942115 kVSOUTHWESTERN PUBLIC SERVICE CO.IN SERVICE0.5 mi
#81584115 kVIN SERVICE7.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP308176, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP308176 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OGALLALASubstation-AdjacentTXCastro County345 kV600 MW3.4 yrs70.9
UNKNOWN303927Substation-AdjacentTXHale County230 kV300 MW3.4 yrs70.2
SWISHERSubstation-AdjacentTXSwisher County230 kV300 MW3.4 yrs69.2
TUCOSubstation-AdjacentTXHale County345 kV600 MW3.4 yrs67.7
COTTONWOODSubstation-AdjacentTXHale County345 kV600 MW3.4 yrs66.9
Greenfield (TULE CANYON - OGALLALA)GreenfieldTXSwisher County345 kV600 MW3.4 yrs65.0
KRESSSubstation-AdjacentTXSwisher County115 kV100 MW3.4 yrs64.4
UNKNOWN303649Substation-AdjacentTXHale County115 kV100 MW3.4 yrs64.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP308176 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.