TAP308064

Substation

Texas · BANDERA ELECTRIC COOP, INC

Max voltage
138
kV

TAP308064 is an electric transmission substation in Texas, operated by BANDERA ELECTRIC COOP, INC. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorBANDERA ELECTRIC COOP, INC
StateTexas
Coordinates29.2491, -98.8442

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#90449138 kVBANDERA ELECTRIC COOP, INCIN SERVICE5.1 mi
#91494138 kVBANDERA ELECTRIC COOP, INCIN SERVICE2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP308064, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP308064 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CAGNON ROADSubstation-AdjacentTXBexar County345 kV600 MW3.4 yrs74.8
HILL COUNTRY 345Substation-AdjacentTXBexar County345 kV600 MW3.4 yrs73.9
TRUMBOSubstation-AdjacentTXBexar County345 kV600 MW3.4 yrs73.1
LEON CREEKSubstation-AdjacentTXBexar County345 kV600 MW3.4 yrs71.7
Leon CreekBrownfieldTXBexar189 MW71.4
Mission RoadBrownfieldTXBexar114 MW69.8
FERN STREETSubstation-AdjacentTXBexar County138 kV100 MW3.4 yrs69.4
TEXAS CRYPTOLOGIC CENTERSubstation-AdjacentTXBexar County138 kV100 MW3.4 yrs69.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP308064 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.