TAP308045

Substation

Texas · UPSHUR RURAL ELEC COOP CORP

Max voltage
345
kV

TAP308045 is an electric transmission substation in Texas, operated by UPSHUR RURAL ELEC COOP CORP. It is classified as high-voltage (345 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines1

Ownership & operation

OperatorUPSHUR RURAL ELEC COOP CORP
StateTexas
Coordinates33.2907, -94.1601

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81907345 kVUPSHUR RURAL ELEC COOP CORPIN SERVICE38.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP308045, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP308045 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN301051Substation-AdjacentARMiller County345 kV600 MW3.4 yrs72.6
UNKNOWN123543Substation-AdjacentARHempstead County345 kV600 MW3.4 yrs71.7
TAP308045Substation-AdjacentARMiller County345 kV600 MW3.4 yrs69.8
Greenfield (UNKNOWN123543 - NORTHWEST TEXA)GreenfieldARHempstead County345 kV600 MW3.4 yrs68.9
UNKNOWN108046Substation-AdjacentARHempstead County115 kV100 MW3.4 yrs68.8
UNKNOWN150150Substation-AdjacentARMiller County138 kV100 MW3.4 yrs67.4
SUGAR HILLSubstation-AdjacentARMiller County138 kV100 MW3.4 yrs67.3
FULTON (AR)Substation-AdjacentARHempstead County115 kV100 MW3.4 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP308045 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.