TAP308039
SubstationTexas · AEP TEXAS CENTRAL CO.
TAP308039 is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #85215 | 138 kV | AEP TEXAS CENTRAL CO. | IN SERVICE | 0.2 mi |
| #88310 | 138 kV | AEP TEXAS CENTRAL CO. | IN SERVICE | 0.1 mi |
| #92775 | 138 kV | AEP TEXAS CENTRAL CO. | IN SERVICE | 6.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP308039, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN303488 | Substation-Adjacent | TX | Cameron County | 138 kV | 100 MW | 3.4 yrs | 68.0 |
| UNKNOWN310396 | Substation-Adjacent | TX | Cameron County | 138 kV | 100 MW | 3.4 yrs | 66.9 |
| UNKNOWN300296 | Substation-Adjacent | TX | Cameron County | 138 kV | 100 MW | 3.4 yrs | 66.2 |
| UNKNOWN303922 | Substation-Adjacent | TX | Cameron County | 138 kV | 100 MW | 3.4 yrs | 66.1 |
| TAP308065 | Substation-Adjacent | TX | Cameron County | 138 kV | 100 MW | 3.4 yrs | 66.0 |
| COFFEE PORT | Substation-Adjacent | TX | Cameron County | 138 kV | 100 MW | 3.4 yrs | 65.7 |
| UNKNOWN300250 | Substation-Adjacent | TX | Cameron County | 138 kV | 100 MW | 3.4 yrs | 65.7 |
| WATERPORT | Substation-Adjacent | TX | Cameron County | 138 kV | 100 MW | 3.4 yrs | 65.7 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.