TAP307992
SubstationTexas · BLUEBONNET ELECTRIC COOP, INC
TAP307992 is an electric transmission substation in Texas, operated by BLUEBONNET ELECTRIC COOP, INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #84083 | 138 kV | BLUEBONNET ELECTRIC COOP, INC | IN SERVICE | 2.4 mi |
| #85037 | 138 kV | BLUEBONNET ELECTRIC COOP, INC | IN SERVICE | 11.6 mi |
| #91801 | 138 kV | BLUEBONNET ELECTRIC COOP, INC | IN SERVICE | 19.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP307992, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN308959 | Substation-Adjacent | TX | Fayette County | 345 kV | 600 MW | 3.4 yrs | 69.7 |
| UNKNOWN300587 | Substation-Adjacent | TX | Fayette County | 345 kV | 600 MW | 3.4 yrs | 69.3 |
| UNKNOWN307818 | Substation-Adjacent | TX | Fayette County | 345 kV | 600 MW | 3.4 yrs | 69.2 |
| FAYETTE PLANT #1 | Substation-Adjacent | TX | Fayette County | 345 kV | 600 MW | 3.4 yrs | 69.2 |
| UNKNOWN305886 | Substation-Adjacent | TX | Fayette County | 345 kV | 600 MW | 3.4 yrs | 69.1 |
| UNKNOWN308399 | Substation-Adjacent | TX | Washington County | 345 kV | 600 MW | 3.4 yrs | 67.4 |
| TAYLOR | Substation-Adjacent | TX | Washington County | 345 kV | 600 MW | 3.4 yrs | 67.2 |
| UNKNOWN306814 | Substation-Adjacent | TX | Washington County | 138 kV | 100 MW | 3.4 yrs | 65.0 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP307992 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.