TAP305447

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
138
kV

TAP305447 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates33.5389, -97.8024

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84041138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE2.3 mi
#84131138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE2.1 mi
#85417138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE8.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP305447, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP305447 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JACKSBOROSubstation-AdjacentTXJack County345 kV600 MW3.4 yrs66.0
DECATURSubstation-AdjacentTXWise County138 kV100 MW3.4 yrs64.5
UNKNOWN309554Substation-AdjacentTXWise County138 kV100 MW3.4 yrs64.5
UNKNOWN301835Substation-AdjacentTXMontague County138 kV100 MW3.4 yrs64.3
Greenfield (UNKNOWN304658 - UNKNOWN300376)GreenfieldTXClay County345 kV600 MW3.4 yrs64.3
TAP310605Substation-AdjacentTXWise County138 kV100 MW3.4 yrs64.2
UNKNOWN300665Substation-AdjacentTXWise County138 kV100 MW3.4 yrs64.2
Greenfield (UNKNOWN300376 - UNKNOWN304658)GreenfieldTXClay County345 kV600 MW3.4 yrs64.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP305447 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.