TAP305425

Substation

Texas · FARMER'S ELECTIRC COOPERATIVE

Max voltage
115
kV

TAP305425 is an electric transmission substation in Texas, operated by FARMER'S ELECTIRC COOPERATIVE. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorFARMER'S ELECTIRC COOPERATIVE
StateTexas
Coordinates35.1583, -103.6887

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81345115 kVFARMER'S ELECTIRC COOPERATIVEIN SERVICE0.1 mi
#87524115 kVFARMER'S ELECTIRC COOPERATIVEIN SERVICE4.6 mi
#90676115 kVFARMER'S ELECTIRC COOPERATIVEIN SERVICE13.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP305425, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP305425 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN306265Substation-AdjacentNMQuay County115 kV100 MW3.4 yrs62.3
UNKNOWN309045Substation-AdjacentNMQuay County115 kV100 MW3.4 yrs60.7
UNKNOWN300384Substation-AdjacentNMQuay County115 kV100 MW3.4 yrs56.2
Greenfield (CURRY COUNTY - NORTON)GreenfieldNMCurry County115 kV100 MW3.4 yrs54.7
Greenfield (UNKNOWN300384 - NORTON)GreenfieldNMQuay County115 kV100 MW3.4 yrs54.0
Greenfield (UNKNOWN300384 - NORTON)GreenfieldNMQuay County115 kV100 MW3.4 yrs53.9
Greenfield (CURRY COUNTY - NORTON)GreenfieldNMQuay County115 kV100 MW3.4 yrs53.7
Greenfield (UNKNOWN309045 - None)GreenfieldNMQuay County115 kV100 MW3.4 yrs53.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP305425 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.