TAP305304

Substation

Texas · SOUTHWESTERN ELECTRIC POWER CO

Max voltage
138
kV

TAP305304 is an electric transmission substation in Texas, operated by SOUTHWESTERN ELECTRIC POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorSOUTHWESTERN ELECTRIC POWER CO
Co-ownerUPSHUR RURAL ELEC COOP CORP
StateTexas
Coordinates32.2203, -94.7759

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81589138 kVUPSHUR RURAL ELEC COOP CORPIN SERVICE2.1 mi
#85351138 kVSOUTHWESTERN ELECTRIC POWER COIN SERVICE6.1 mi
#86188138 kVUPSHUR RURAL ELEC COOP CORP0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP305304, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP305304 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MARTIN LAKESSubstation-AdjacentTXRusk County345 kV600 MW3.4 yrs72.8
UNKNOWN308218Substation-AdjacentTXRusk County345 kV600 MW3.4 yrs70.2
UNKNOWN304391Substation-AdjacentTXRusk County345 kV600 MW3.4 yrs69.8
UNKNOWN304659Substation-AdjacentTXGregg County345 kV600 MW3.4 yrs69.0
PirkeyBrownfieldTXHarrison721 MW68.4
STRYKER CREEKSubstation-AdjacentTXCherokee County345 kV600 MW3.4 yrs67.8
UNKNOWN309941Substation-AdjacentTXHarrison County345 kV600 MW3.4 yrs67.6
UNKNOWN300974Substation-AdjacentTXHarrison County345 kV600 MW3.4 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP305304 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.