TAP305277

Substation

Texas · AEP TEXAS NORTH CO.

Max voltage
138
kV

TAP305277 is an electric transmission substation in Texas, operated by AEP TEXAS NORTH CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorAEP TEXAS NORTH CO.
Co-ownerTAYLOR ELECTRIC COOP INC - (TX)
StateTexas
Coordinates32.0173, -100.2743

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81759138 kVAEP TEXAS NORTH CO.0.0 mi
#84519138 kVAEP TEXAS NORTH CO.2.8 mi
#91590138 kVTAYLOR ELECTRIC COOP INC - (TX)IN SERVICE29.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP305277, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP305277 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN307500Substation-AdjacentTXTaylor County345 kV600 MW3.4 yrs69.9
CENTRAL BLUFFSubstation-AdjacentTXTaylor County345 kV600 MW3.4 yrs68.3
UNKNOWN309410Substation-AdjacentTXNolan County345 kV600 MW3.4 yrs67.9
UNKNOWN301998Substation-AdjacentTXTaylor County138 kV100 MW3.4 yrs65.4
Greenfield (ABILENE MULBERRY CREEK - BLUFF)GreenfieldTXTaylor County345 kV600 MW3.4 yrs65.2
UNKNOWN309790Substation-AdjacentTXTaylor County138 kV100 MW3.4 yrs65.1
UNKNOWN303554Substation-AdjacentTXRunnels County138 kV100 MW3.4 yrs64.3
BUFFALO GAP WIND FARMSubstation-AdjacentTXTaylor County138 kV100 MW3.4 yrs63.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP305277 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.