TAP305192

Substation

Texas · LYNTEGAR ELECTRIC COOP, INC

Max voltage
115
kV

TAP305192 is an electric transmission substation in Texas, operated by LYNTEGAR ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorLYNTEGAR ELECTRIC COOP, INC
StateTexas
Coordinates32.9641, -102.6123

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#89325115 kVLYNTEGAR ELECTRIC COOP, INC2.7 mi
#92735115 kVLYNTEGAR ELECTRIC COOP, INC4.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP305192, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP305192 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP302515Substation-AdjacentTXYoakum County230 kV300 MW3.4 yrs65.9
UNKNOWN302167Substation-AdjacentTXYoakum County230 kV300 MW3.4 yrs65.0
DENVER CITYSubstation-AdjacentTXYoakum County230 kV300 MW3.4 yrs64.6
WASSON SWITCHINGSubstation-AdjacentTXYoakum County230 kV300 MW3.4 yrs64.6
SEAGRAVESSubstation-AdjacentTXGaines County115 kV100 MW3.4 yrs64.0
TERRY COSubstation-AdjacentTXTerry County115 kV100 MW3.4 yrs63.1
TAP308106Substation-AdjacentTXYoakum County230 kV300 MW3.4 yrs62.9
ROZSubstation-AdjacentTXGaines County115 kV100 MW3.4 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP305192 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.