TAP305178

Substation

Texas · FARMER'S ELECTIRC COOPERATIVE

Max voltage
230
kV

TAP305178 is an electric transmission substation in Texas, operated by FARMER'S ELECTIRC COOPERATIVE. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorFARMER'S ELECTIRC COOPERATIVE
StateTexas
Coordinates34.4119, -103.2504

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#91174230 kVFARMER'S ELECTIRC COOPERATIVEIN SERVICE11.9 mi
#83230115 kVFARMER'S ELECTIRC COOPERATIVEIN SERVICE0.1 mi
#88501115 kVFARMER'S ELECTIRC COOPERATIVEIN SERVICE3.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP305178, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP305178 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROOSEVELT COUNTYSubstation-AdjacentNMCurry County345 kV600 MW3.4 yrs70.8
TAP305178Substation-AdjacentNMCurry County230 kV300 MW3.4 yrs68.0
UNKNOWN304303Substation-AdjacentNMCurry County230 kV300 MW3.4 yrs65.7
Greenfield (BLACKWATER TIE - TAIBAN MESA)GreenfieldNMCurry County345 kV600 MW3.4 yrs63.5
UNKNOWN301294Substation-AdjacentNMRoosevelt County115 kV100 MW3.4 yrs63.4
UNKNOWN300243Substation-AdjacentTXParmer County115 kV100 MW3.4 yrs62.6
TAP318068Substation-AdjacentNMCurry County115 kV100 MW3.4 yrs62.5
Greenfield (BLACKWATER TIE - TAIBAN MESA)GreenfieldNMCurry County345 kV600 MW3.4 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen