TAP302764
SubstationTexas · ONCOR ELECTRIC DELIVERY CO.
TAP302764 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #79993 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | — | 10.4 mi |
| #89346 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | — | 11.0 mi |
| #91870 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | IN SERVICE | 4.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP302764, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN308218 | Substation-Adjacent | TX | Rusk County | 345 kV | 600 MW | 3.4 yrs | 70.2 |
| UNKNOWN304391 | Substation-Adjacent | TX | Rusk County | 345 kV | 600 MW | 3.4 yrs | 69.8 |
| STRYKER CREEK | Substation-Adjacent | TX | Cherokee County | 345 kV | 600 MW | 3.4 yrs | 67.8 |
| UNKNOWN305033 | Substation-Adjacent | TX | Cherokee County | 138 kV | 100 MW | 3.4 yrs | 65.5 |
| NACOGDOCHES | Substation-Adjacent | TX | Nacogdoches County | 345 kV | 600 MW | 3.4 yrs | 65.4 |
| UNKNOWN308721 | Substation-Adjacent | TX | Angelina County | 138 kV | 100 MW | 3.4 yrs | 65.3 |
| Pinecrest Energy Center | Brownfield | TX | Angelina County | 138 kV | 753 MW | 3.4 yrs | 64.6 |
| UNKNOWN309176 | Substation-Adjacent | TX | Angelina County | 138 kV | 100 MW | 3.4 yrs | 64.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP302764 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.