TAP302727 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates33.1228, -98.6121

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82453138 kVONCOR ELECTRIC DELIVERY CO.0.8 mi
#83654138 kVONCOR ELECTRIC DELIVERY CO.17.3 mi
#88576138 kVONCOR ELECTRIC DELIVERY CO.18.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302727, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302727 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN305641Substation-AdjacentTXJack County345 kV600 MW3.4 yrs66.6
UNKNOWN306212Substation-AdjacentTXYoung County345 kV600 MW3.4 yrs65.9
UNKNOWN305554Substation-AdjacentTXJack County345 kV600 MW3.4 yrs65.7
UNKNOWN306912Substation-AdjacentTXArcher County345 kV600 MW3.4 yrs64.3
COMANCHESubstation-AdjacentTXArcher County345 kV600 MW3.4 yrs63.8
UNKNOWN309361Substation-AdjacentTXYoung County345 kV600 MW3.4 yrs63.4
UNKNOWN309899Substation-AdjacentTXArcher County138 kV100 MW3.4 yrs61.6
UNKNOWN303319Substation-AdjacentTXArcher County138 kV100 MW3.4 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP302727 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.