TAP302722

Substation

Texas · BOWIE-CASS ELECTRIC COOP, INC

Max voltage
138
kV

TAP302722 is an electric transmission substation in Texas, operated by BOWIE-CASS ELECTRIC COOP, INC. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorBOWIE-CASS ELECTRIC COOP, INC
StateTexas
Coordinates33.3692, -94.4761

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#89314138 kVBOWIE-CASS ELECTRIC COOP, INCIN SERVICE10.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302722, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302722 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN309146Substation-AdjacentTXMorris County345 kV600 MW3.4 yrs70.5
TAP308045Substation-AdjacentARMiller County345 kV600 MW3.4 yrs69.8
SUGAR HILLSubstation-AdjacentARMiller County138 kV100 MW3.4 yrs67.3
UNKNOWN309392Substation-AdjacentARMiller County138 kV100 MW3.4 yrs65.3
PATTERSONSubstation-AdjacentARLittle River County138 kV100 MW3.4 yrs65.0
UNKNOWN300032Substation-AdjacentTXBowie County138 kV100 MW3.4 yrs64.8
NORTHWEST TEXARKANASubstation-AdjacentARLittle River County345 kV600 MW3.4 yrs64.7
UNKNOWN300411Substation-AdjacentTXBowie County138 kV100 MW3.4 yrs64.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.