TAP302722
SubstationTexas · BOWIE-CASS ELECTRIC COOP, INC
TAP302722 is an electric transmission substation in Texas, operated by BOWIE-CASS ELECTRIC COOP, INC. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #89314 | 138 kV | BOWIE-CASS ELECTRIC COOP, INC | IN SERVICE | 10.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP302722, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN309146 | Substation-Adjacent | TX | Morris County | 345 kV | 600 MW | 3.4 yrs | 70.5 |
| TAP308045 | Substation-Adjacent | AR | Miller County | 345 kV | 600 MW | 3.4 yrs | 69.8 |
| SUGAR HILL | Substation-Adjacent | AR | Miller County | 138 kV | 100 MW | 3.4 yrs | 67.3 |
| UNKNOWN309392 | Substation-Adjacent | AR | Miller County | 138 kV | 100 MW | 3.4 yrs | 65.3 |
| PATTERSON | Substation-Adjacent | AR | Little River County | 138 kV | 100 MW | 3.4 yrs | 65.0 |
| UNKNOWN300032 | Substation-Adjacent | TX | Bowie County | 138 kV | 100 MW | 3.4 yrs | 64.8 |
| NORTHWEST TEXARKANA | Substation-Adjacent | AR | Little River County | 345 kV | 600 MW | 3.4 yrs | 64.7 |
| UNKNOWN300411 | Substation-Adjacent | TX | Bowie County | 138 kV | 100 MW | 3.4 yrs | 64.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP302722 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.