TAP302630

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
138
kV

TAP302630 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates30.2069, -97.7156

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84614138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE1.5 mi
#89148138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE0.8 mi
#89285138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302630, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302630 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DUNLAPSubstation-AdjacentTXTravis County345 kV600 MW3.4 yrs73.1
UNKNOWN304304Substation-AdjacentTXTravis County345 kV600 MW3.4 yrs72.4
ROUND ROCK NORTHEASTSubstation-AdjacentTXWilliamson County345 kV600 MW3.4 yrs72.1
PEDERNALESSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs71.5
DECKERSubstation-AdjacentTXTravis County345 kV600 MW3.4 yrs70.8
UNKNOWN306282Substation-AdjacentTXBastrop County345 kV600 MW3.4 yrs70.4
AUSTROPSubstation-AdjacentTXTravis County345 kV600 MW3.4 yrs70.0
MCNEILSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs69.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP302630 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.