TAP302626

Substation

Texas · CITY OF BRADY

Max voltage
138
kV

TAP302626 is an electric transmission substation in Texas, operated by CITY OF BRADY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorCITY OF BRADY
Co-ownerSHARYLAND UTILITIES, LP
StateTexas
Coordinates31.1187, -99.3117

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87546138 kVCITY OF BRADY2.3 mi
#89990138 kVIN SERVICE27.8 mi
#91549138 kVSHARYLAND UTILITIES, LP1.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302626, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302626 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN308968Substation-AdjacentTXMcCulloch County138 kV100 MW3.4 yrs62.0
UNKNOWN301190Substation-AdjacentTXMcCulloch County138 kV100 MW3.4 yrs61.5
Greenfield (SAN ANGELO RED CREEK - BROWN)GreenfieldTXMcCulloch County345 kV600 MW3.4 yrs61.4
Greenfield (UNKNOWN310485 - UNKNOWN307500)GreenfieldTXMcCulloch County345 kV600 MW3.4 yrs60.5
Greenfield (BROWN - SAN ANGELO RED CREEK)GreenfieldTXMcCulloch County345 kV600 MW3.4 yrs59.7
Greenfield (UNKNOWN310485 - UNKNOWN307500)GreenfieldTXMcCulloch County345 kV600 MW3.4 yrs59.6
UNKNOWN306699Substation-AdjacentTXMason County138 kV100 MW3.4 yrs59.6
TAP302626Substation-AdjacentTXMcCulloch County138 kV100 MW3.4 yrs59.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen