TAP302599

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
161
kV

TAP302599 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates32.0534, -96.4458

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#88344161 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE2.8 mi
#88306138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE1.4 mi
#88507138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE5.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302599, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302599 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TRINIDADSubstation-AdjacentTXHenderson County345 kV600 MW3.4 yrs68.7
UNKNOWN306657Substation-AdjacentTXNavarro County345 kV600 MW3.4 yrs68.6
Big BrownBrownfieldTXFreestone1,987 MW68.3
BIG BROWNSubstation-AdjacentTXFreestone County345 kV600 MW3.4 yrs66.0
Greenfield (UNKNOWN306657 - WATERMILL)GreenfieldTXEllis County345 kV600 MW3.4 yrs65.5
UNKNOWN307415Substation-AdjacentTXNavarro County138 kV100 MW3.4 yrs64.8
UNKNOWN305918Substation-AdjacentTXEllis County138 kV100 MW3.4 yrs64.8
UNKNOWN308869Substation-AdjacentTXEllis County138 kV100 MW3.4 yrs64.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP302599 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.