TAP302525

Substation

Texas · CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC

Max voltage
138
kV

TAP302525 is an electric transmission substation in Texas, operated by CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
StateTexas
Coordinates29.7327, -95.2295

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81451138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE0.4 mi
#91141138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302525, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302525 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROTHWOODSubstation-AdjacentTXMontgomery County345 kV600 MW3.4 yrs75.8
TOMBALLSubstation-AdjacentTXMontgomery County345 kV600 MW3.4 yrs73.8
DEEPWATERSubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs73.7
GREENS BAYOU 345Substation-AdjacentTXHarris County345 kV600 MW3.4 yrs73.6
WHITE OAKSubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs73.6
JEANETTASubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs73.0
BELLAIRESubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs72.9
UNKNOWN304285Substation-AdjacentTXHarris County345 kV600 MW3.4 yrs72.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP302525 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.