TAP302515

Substation

Texas · LEA COUNTY ELECTRIC COOP, INC

Max voltage
230
kV

TAP302515 is an electric transmission substation in Texas, operated by LEA COUNTY ELECTRIC COOP, INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorLEA COUNTY ELECTRIC COOP, INC
StateTexas
Coordinates33.1241, -102.7325

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#86910230 kVLEA COUNTY ELECTRIC COOP, INCIN SERVICE2.2 mi
#90324230 kVLEA COUNTY ELECTRIC COOP, INCIN SERVICE9.8 mi
#80899115 kVIN SERVICE15.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302515, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302515 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN306021Substation-AdjacentTXHockley County230 kV300 MW3.4 yrs68.4
UNKNOWN307246Substation-AdjacentTXHockley County230 kV300 MW3.4 yrs66.7
TAP302515Substation-AdjacentTXYoakum County230 kV300 MW3.4 yrs65.9
UNKNOWN302167Substation-AdjacentTXYoakum County230 kV300 MW3.4 yrs65.0
DENVER CITYSubstation-AdjacentTXYoakum County230 kV300 MW3.4 yrs64.6
WASSON SWITCHINGSubstation-AdjacentTXYoakum County230 kV300 MW3.4 yrs64.6
SEAGRAVESSubstation-AdjacentTXGaines County115 kV100 MW3.4 yrs64.0
UNKNOWN304346Substation-AdjacentTXHockley County115 kV100 MW3.4 yrs64.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP302515 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.