TAP302500

Substation

Texas · FARMERS ELECTRIC COOP, INC - (TX)

Max voltage
138
kV

TAP302500 is an electric transmission substation in Texas, operated by FARMERS ELECTRIC COOP, INC - (TX). It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorFARMERS ELECTRIC COOP, INC - (TX)
StateTexas
Coordinates32.6390, -95.3148

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#80994138 kVFARMERS ELECTRIC COOP, INC - (TX)IN SERVICE10.5 mi
#87702138 kVFARMERS ELECTRIC COOP, INC - (TX)IN SERVICE0.0 mi
#91965138 kVFARMERS ELECTRIC COOP, INC - (TX)IN SERVICE8.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302500, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302500 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SHAMBURGERSubstation-AdjacentTXSmith County345 kV600 MW3.4 yrs70.3
UNKNOWN306638Substation-AdjacentTXCamp County345 kV600 MW3.4 yrs69.8
UNKNOWN306553Substation-AdjacentTXSmith County345 kV600 MW3.4 yrs69.7
UNKNOWN306214Substation-AdjacentTXVan Zandt County345 kV600 MW3.4 yrs68.7
UNKNOWN300127Substation-AdjacentTXSmith County345 kV600 MW3.4 yrs68.1
TAP318131Substation-AdjacentTXVan Zandt County345 kV600 MW3.4 yrs67.4
TAP302473Substation-AdjacentTXSmith County345 kV600 MW3.4 yrs66.3
UNKNOWN306778Substation-AdjacentTXSmith County345 kV600 MW3.4 yrs65.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP302500 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.