TAP302488

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
138
kV

TAP302488 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates33.7685, -98.6742

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79399138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE2.9 mi
#79400138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE0.5 mi
#91193138 kVONCOR ELECTRIC DELIVERY CO.26.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302488, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302488 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN306791Substation-AdjacentTXClay County345 kV600 MW3.4 yrs71.2
UNKNOWN309695Substation-AdjacentTXWichita County345 kV600 MW3.4 yrs69.6
UNKNOWN302104Substation-AdjacentTXClay County138 kV100 MW3.4 yrs66.9
UNKNOWN304596Substation-AdjacentTXWichita County138 kV100 MW3.4 yrs66.1
UNKNOWN306052Substation-AdjacentTXWichita County138 kV100 MW3.4 yrs65.6
Greenfield (UNKNOWN300376 - UNKNOWN304658)GreenfieldOKTillman County345 kV600 MW3.4 yrs65.0
UNKNOWN303758Substation-AdjacentTXClay County138 kV100 MW3.4 yrs64.8
Greenfield (UNKNOWN306791 - UNKNOWN300376)GreenfieldTXWichita County345 kV600 MW3.4 yrs64.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP302488 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.