TAP175808

Substation

Texas · PUBLIC SERVICE CO OF OKLAHOMA

Max voltage
138
kV

TAP175808 is an electric transmission substation in Texas, operated by PUBLIC SERVICE CO OF OKLAHOMA. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorPUBLIC SERVICE CO OF OKLAHOMA
StateTexas
Coordinates35.5585, -98.6944

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#63967138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE13.0 mi
#63968138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE6.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP175808, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP175808 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TATONGASubstation-AdjacentOKDewey County345 kV600 MW3.4 yrs69.3
UNKNOWN168533Substation-AdjacentOKCuster County138 kV100 MW3.4 yrs66.8
TAP168534Substation-AdjacentOKCuster County138 kV100 MW3.4 yrs66.7
ROMAN NOSESubstation-AdjacentOKBlaine County138 kV100 MW3.4 yrs66.6
UNKNOWN118423Substation-AdjacentOKCuster County138 kV100 MW3.4 yrs66.6
UNKNOWN173344Substation-AdjacentOKBlaine County138 kV100 MW3.4 yrs66.4
Greenfield (TATONGA - MATHEWSON)GreenfieldOKBlaine County345 kV600 MW3.4 yrs66.3
Greenfield (TATONGA - MATHEWSON)GreenfieldOKBlaine County345 kV600 MW3.4 yrs66.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP175808 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.