TAP149749

Substation

Texas · PUBLIC SERVICE CO OF OKLAHOMA

Max voltage
138
kV

TAP149749 is an electric transmission substation in Texas, operated by PUBLIC SERVICE CO OF OKLAHOMA. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorPUBLIC SERVICE CO OF OKLAHOMA
StateTexas
Coordinates35.3722, -99.3988

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#216138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE0.0 mi
#4504138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE4.7 mi
#23340138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE1.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP149749, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP149749 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN159874Substation-AdjacentOKBeckham County345 kV600 MW3.4 yrs71.2
ELK CITYSubstation-AdjacentOKBeckham County230 kV300 MW3.4 yrs68.9
CHISHOLMSubstation-AdjacentOKWashita County345 kV600 MW3.4 yrs67.8
TAP149238Substation-AdjacentOKBeckham County138 kV100 MW3.4 yrs66.1
Greenfield (CHISHOLM - UNKNOWN159874)GreenfieldOKBeckham County345 kV600 MW3.4 yrs65.5
UNKNOWN118827Substation-AdjacentOKCuster County138 kV100 MW3.4 yrs65.5
UNKNOWN168528Substation-AdjacentOKBeckham County138 kV100 MW3.4 yrs64.9
UNKNOWN118685Substation-AdjacentOKCuster County138 kV100 MW3.4 yrs64.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP149749 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.